Coal loader part III

I started the construction on the coal loader at Mine II on the Wharton branch.Other than originally planned it will only use the northern track, while the southern is used for storage. I started to design the baseplate and a pivot plate as well as the abutments, which will hold the building in place. Since...

Junction signaling Part III

Recently I made some more progress on the signalling of Bend Jct. I started the assembling of the masts for the color position light signals. The mast is made out of a 1.1 mm brass tubing for the upper mast section and 1.5 mm brass tubing for the lower mast section. The 1.1 mm tubing...

Scroll to top