Not much progress on the bridge scene, but a minor step to complete the look of the bridge itself.
I added two telephone crossarm bracing to the bridge to simulate the continuity of the line along the bridge itself.
In a first try, I added a double pole mast on either side of the hillside, but found it would look too much on this rather short bridge.
![](https://canderr.nscaleworks.com/wp-content/uploads/sites/2/2021/12/img_20211219_215644701854175200761657-1024x573.jpg)
I came up with the idea to attach the crossarms directly to the bridge, and found a good prototype photo on the Internet – http://bridgestunnels.com/location/prince-railroad-bridge/
I modified my crossarm set to have the eight isolator sitting with even spacing on the crossarm and added some evergreen #100 styrene strips to mimic the additional bracing.
A bit of color and the two bracing are finished and add a bit more realism to this scene.
![](https://canderr.nscaleworks.com/wp-content/uploads/sites/2/2022/01/IMG_20220115_164403-1024x576.jpg)
![](https://canderr.nscaleworks.com/wp-content/uploads/sites/2/2022/01/IMG_20220115_171201-scaled-e1642265793205-1024x570.jpg)
![](https://canderr.nscaleworks.com/wp-content/uploads/sites/2/2022/01/IMG_20220115_171116-1024x573.jpg)