3 years ago I took this photo of the East Grain Mill complex.
A few details moved in
I recently created some details for the layout scenes that I stumbled across while browsing the net.A yard speaker, that was probably used for communication between train crew and yard master before CB radio was established in locomotives. As my era is settled in early 80ies I found it plausible to add them to the...
Junction signaling Part III
Recently I made some more progress on the signalling of Bend Jct. I started the assembling of the masts for the color position light signals. The mast is made out of a 1.1 mm brass tubing for the upper mast section and 1.5 mm brass tubing for the lower mast section. The 1.1 mm tubing...
Junction signaling Part II
Here is part two for my endeavor into junction signaling at Bend Jct. In addition to the planed signals to govern the turnout routes, I plan to add an occupancy detection for the turnouts. This idea occurred not only for the junction, but I had it in mind for a longer time. I didn’t want...
Junction signaling Part I
First mockup for the junction signaling at Bend Jct. / Sarverville. I aim to mimic manual interlocking signals with no block detection outside the two turnouts.Red pushpins mark the home signals and yellow the distant signals. I will install 4 home signals a one is governing the movement out of Sarverville siding and yard.
Working on the bridge scene – Part 3
Not much progress on the bridge scene, but a minor step to complete the look of the bridge itself. I added two telephone crossarm bracing to the bridge to simulate the continuity of the line along the bridge itself. In a first try, I added a double pole mast on either side of the hillside,...
Adding some hoppers to the roster II
I managed to finish the new hoppers today. I added a total of 6 H21 hoppers for the coal service. And did some zebra-skewers … more on the skewers at the end of this post. All six hoppers in various aged states … yes, there are 7 in the photo. The one on the upper...
Adding some hoppers to the roster
First task in 2022 … we need more hoppers in coal-service …I started to convert some old Bowser H21 4 bay hopper kits for the C&E coal service.
Working on the bridge scene – Part 2
Work on the bridge scene continued, and I could close the gap in the track. After the stream was finished, I started to work on some trees for the background behind the bridge. I had to finish this part prior to gluing the bridge in place, otherwise it would be hard to reach. Before I...