Back to square one

Some time things are going slow and sometimes things change.

I am currently unable to post progress on my layout, because there isn’t any progress to report.
I will need to relocate “aka tear down” a large portion of the layout in the near future, because I need the space in the layout room for non modelrailroad stuff.

That means I will have to dismantle the Sarverville / East Staging penninsula section also with the loop to the coal-mines. With this section removed, the current system will not function anymore because of a large cut in operations.

I could keep the Elizabeth Oaks section and the Red-Rock peninsula.

But I’m currently considering puting the C&E system on a large overhaul, starting basically from scratch within the new room boundaries.

Stay tuned.